Connect with us

Business

Again, Dangote Shut Down Tomato Processing Factory

Published

on

tomato paste
  • Again, Dangote Shut Down Tomato Processing Factory

Dangote tomato processing factory has shut down for the second time last week following the inability of the factory to access necessary raw materials.

A Bloomberg report said the farmers engaged by the factory to supply raw materials abandoned tomato farming for other crops at the start of the rainy season in May.

It would be recalled that the factory experienced the same thing about three years ago when engaged farmers complained of flooding and immediately left tomato farming for other crops, an occurrence that forced the factory to shut down for three years.

The factory reopened in March 2019 and shut down again last week because of the same reason. Meaning, until Dangote find a permanent solution by taking charge of the entire value chain process, including farming like he did with other businesses the factory may never be fully operational or even open for long.

Since the plant was inaugurated in March 2016, it has only been operational for just 13 months.

The company was established to reduce tomato paste importation estimated at 400,000 tonnes per year.

However, it is now obvious that the issue is not just the lack of tomato processing factory but also the lack of necessary raw materials.

Therefore, it is the shortage of fresh tomatoes that fuels the demand for imported tomato paste and also explains why the price of fresh tomatoes fluctuate with dollar liquidity.

Again, it shows the 400,000 tonnes is the reason a lot of us can still access imported tomato paste or fresh tomatoes.

In March, during the reopening ceremony of the plant, Mr. Abdulkarim Kaita, the Managing Director of the plant, said the factory was losing N30 million per month in maintenance fee, therefore it was necessary to commence operation regardless of production level to curtail losses.

The factory resumed production at 100 tonnes a day out of 1,200 tonnes capacity, hoping to up production over time. Barely 6 months later it has shut down again for the same reason.

CEO/Founder Investors King Ltd, a foreign exchange research analyst, contributing author on New York-based Talk Markets and Investing.com, with over a decade experience in the global financial markets.

Business

Portland Paints, Chemical and Allied Products Plc Agreed to Merge

Published

on

Portland Paints

Portland Paints, Chemical and Allied Products Plc Agreed to Merge

Portland Paints and Products Nigeria Plc and Chemical and Allied Products Plc have agreed to merge, according to the latest statement from both companies.

In a statement released through the Nigerian Stock Exchange, the Board of Directors of CAP said we are “pleased to inform you that following discussions and negotiations, the Boards of CAP and Portland Paints have reached an agreement to undertake a merger between both entities (the “Merger” or the “Proposed Merger”).

Accordingly, we “hereby present to you the terms and benefits of the Proposed Merger for your consideration and seek your support and approval to effect the Proposed Merger.

“The Proposed Merger presents a compelling opportunity to create significant value for shareholders of CAP and achieve the company’s strategic growth objectives as a larger company with a broader product portfolio, more corporate owned brands and diversified revenues.

“The resultant entity is also expected to benefit from enhanced distribution capabilities in addition to economies of scale and operational efficiencies.”

Continue Reading

Business

Tony Elumelu Acquires Shell, Total, ENI Stakes in OML 17

Published

on

Shell

Tony Elumelu Acquires Shell, Total, ENI Stakes in OML 17

Tony Elumelu owned Heir Holdings Limited and its related company Transnational Corporation of Nigeria Plc on Friday announced it has completed the purchase of 45 percent stake in Oil Mining Lease (OML 17) through TNOG Oil and Gas Limited.

The acquisition includes all assets of Shell Petroleum Development Company of Nigeria Limited (30 Percent), Total E&P Nigeria Ltd (10 percent) and ENI (five percent) — in the lease.

It was further stated that TNOG Oil and Gas Limited will also have the sole right to operate OML 17.

The field presently has a production capacity of 27,000 barrels per day. Also, there are estimated 2P reserves (proven and probable) of 1.2 billion barrels and an additional one billion barrels in possible reserves — all of oil equivalent.

A consortium of global and regional banks and investors provided a financing component of $1.1 billion for the largest oil and gas financing in Africa in over a decade.

In a statement released on Friday, Shell said the completion was after all the necessary approvals have were received from authorities.

“A total of $453m was paid at completion with the balance to be paid over an agreed period. SPDC will retain its interest in the Port Harcourt Industrial and Residential Areas, which fall within the lease area,” the SPDC said.

Speaking after the completion of the deal, Elumelu said “We have a very clear vision: creating Africa’s first integrated energy multinational, a global quality business, uniquely focused on Africa and Africa’s energy needs. The acquisition of such a high-quality asset, with significant potential for further growth, is a strong statement of our confidence in Nigeria, the Nigerian oil and gas sector and a tribute to the extremely high-quality management team that we have assembled.

“As a Nigerian, and more particularly an indigene of the Niger Delta region, I understand well our responsibilities that come with stewardship of the asset, our engagement with communities and the strategic importance of the oil and gas sector in Nigeria. We see significant benefits from integrating our production, with our ability to power Nigeria, through Transcorp, and deliver value across the energy value chain.

“I would like to thank Shell, Total and ENI, for the professionalism of the process, the Federal Government of Nigeria, the Ministry of Petroleum Resources, and the NNPC for the confidence they have placed in us.”

Tony Elumelu is the Chairman of Heirs Holdings Limited, Transcorp and United Bank for Africa Plc.

Also, read Transcorp Plc Acquires FGN’s 100% Equity in Afam Power for N105 Billion

Continue Reading

Business

Exporters Say CBN Pre-export Requirements is Frustrating Export of Goods

Published

on

Institute of Chartered Shipbrokers

Exporters Say CBN Pre-export Requirements is Frustrating Export of Goods

Exporters have said the recently introduced pre-export requirements by the Central Bank of Nigeria is creating unnecessary bottlenecks for exporters and the movement of goods out of the country.

Exporters, who spoke under the aegis of the Network of Practicing Non-oil Exporters of Nigeria (NPNEN), said the electronic Nigeria Export Proceed Form now required by financial institutions from exporters had come with so many challenges.

Ahmed Rabiu, the President, NPNEN, explained that the new policy had several requirements that often led to delays and loss of income on the part of exporters.

He said, “We acknowledge the CBN’s desire to ensure that all exports out of Nigeria are documented in order to ensure that the proceeds of such exports are repatriated.

“However, the reality on the field shows that the process is causing undue delays and consequently, encouraging corruption.

According to them, in the new pre-export requirements, the Central Bank of Nigeria wants an export transaction to be initiated through eNXP processing on the trade monitoring system.

After which exporters are expected to have a pre-shipment inspection agent, the Nigeria Customs Service and other designated government agencies carry out their pre-export inspections.

The exporters said the pre-shipment inspection agent was expected to issue a clean Certificate of Inspection while Customs would issue the Single Good Declaration. All these they said takes time and delay goods from leaving the country on time.

Pointing to a recent report, they said about N868 billion worth of goods bound for export were stuck at the ports due to the new policy.

Speaking further Rabiu said, “For example, for the PIA to issue the CCI, the exporter is required to upload a certificate of origin as one of the supporting documents for the eNXP.

“The PIA is also required to upload the CCI to the TRMS(M) and until this is done, the Customs service will not issue the Single Good Declaration.”

He added, “After issuing the SGD, the customs is further required to upload it into the TRMS before the goods are allowed to be gated into the port and loaded on the vessel by the shipping line.

Continue Reading

Trending